New Art Studio stage 2
Having spent some time clearing out the 'valuable' contents of the garage, a damp proof wooden underfloor has been laid and all the insulation etc has arrived.
When the insulation was delivered the vehicle that they used to put the pallet on our drive was huge and unfortunately completely shattered the main drain manhole cover, which resulted in a two day delay while they made good the damage they had caused during delivery.
Today the new front of the Studio is being put in place which will be a huge improvement on the way the building looks, and also provide a good secure access to the Studio. Once this is installed we will be able to get on with installing the insulation inside :-)